Lead time varies significantly:
- For Existing Dies (Catalog Parts): Can be as short as 2-6 weeks for production and shipping, depending on quantity and finish.
- For New Custom Dies: Adds 6-12 weeks for die design, fabrication, sampling, and approval before production can begin. Total lead time can be 3-4 months for the first order.
- Factors Influencing Lead Time: Complexity of the die, alloy, required temper (T6 takes longer than T5), post-processing (anodizing, cutting, machining), and the extruder’s current workload.
Always consult with your supplier early in the design phase to get an accurate timeline.